When you love the street but need more house. Additions engineered, permitted and built so well the seam disappears.
Anyone can build a box next to your house. The craft is in the tie-in: foundations that meet, floors that align without a step, a roofline that flows, and siding blended so nobody can point to where old ends and new begins.
We handle the full approval chain - survey, setbacks, engineering, permits and inspections - and give you a fixed contract price before ground breaks.
The honest math: an addition wins when you like your location and lot. We'll give you a real number so you can compare it to real listings.
Almost never. The addition goes up outside the wall first; we break through at the end, and the messy weeks are short.
Design and permits typically 1-3 months, construction 2-4 months depending on size. You get the full timeline in writing.